Ahmadi, Fazlullah Nasiriani, Khadijeh. Abazari, Parvaneh. (2008), Delphi Technique: A Tool in Research, Iranian Journal of Medical Education, Year 8, Issue 1, 185-175. . (In Persian)
Ahrariroudi, Mohyeddin.(2018), Assessment the effects of drought on groundwater quantity and quality of Sistan and Baluchistan Province, New findings of applied geology, 12(23), 104-113.
Alamatian, Ebrahim. Seifi Abdolabadi, Farzad. (2018), Integration of Risk Engineering Value Engineering in Irrigation Projects under Pressure of Hot-Dry Areas, 13th International Symposium on Science and Technology Advances: Sustainable Land, Civil and Environmental Engineering, Mashhad .(In Persian)
Alizadeh, Ali. (2014) Delphi Research, First Edition, Tehran: Yousef Publications. . (in Persian)
Amiri, Maghsoud. (2010), Group decision making for selecting machine tools using Victor Fuzzy method, Scientific-Research Quarterly Journal of Industrial Management Studies, Volume 6, Number 16, 188-167. (In Persian)
Ataiee, Mohammad (2010). Multi-criteria decision making, (first edition), Shahroud: Shahroud University of Technology Publications. (In Persian)
Darwish, Sahar. Shirmohammadi, Vahid. Ranjbar, Fatemeh. Nahavandchi, Mehrdad. (2015), Reviewing and presenting environmental risk assessment models with the aim of improving the environmental management system, International Conference on Environment and Natural Resources, Shiraz. (In Persian)
Huang, J. J., Tzeng, G. H., & Liu, H. H., (2009). A revised VIKOR model for multiple criteria decision making – the perspective of regret theory. In: Shi, Y. et al (Eds.) Cutting-Edge Research Topics on Multiple Criteria Decision Making. Springer, Berlin Heidelberg, 761-768.
Jafarnejad, Ahmad Yousefi Zanooz, Reza. (2008), Presenting a fuzzy model of Band risk rank in Petro Pars Company's drilling projects, Journal of Industrial Management, Volume 1, Number 1, 38-21. (In Persian)
Karimi, Touraj. Sadeghi Moghadam, Mohammad Reza (2014), Raff Collections and Gray Collections, First Edition, Tehran: Mehraban Book. . (In Persian)
Kazazi, Abolfazl. Faizi Rad, Mohammad Ali. (2014), Development of SPACE matrix with the help of fuzzy fuzzy hierarchical analysis to determine the strategic position of the business, Quarterly Journal of Modern Marketing Research, Fourth Year, No. 3, 74-55. (In Persian)
Khatami Firoozabadi, Ali. (2008). Multi-Criteria Decision Making, (First Edition), Tehran: Miran Emrooz Marand Publications. . (In Persian)
kolahan, Farhad. Rezaei Nik, Ibrahim. Hassani Dooghabadi, Marzieh et al. (2014), Identifying and prioritizing the risks of the country's electricity industry development projects, Journal of Industrial Engineering, Volume 49, Number 1, Pages 107-116. (In Persian)
Mousavi, Anahita. Abdi, Farshid. Raeisi, Siddiq. (2014), Ranking of Risk Factors of Research Projects with the Combination of Network Analysis Process Methods and Fuzzy DEMATEL, Scientific-Promotional Quarterly Journal of Standard and Quality Management, Fourth Year, No. 3, Pages 57-48. . (In Persian)
Omidvar M, Nirumand F. (2017). Risk assessment using FMEA method and on the basis of MCDM, fuzzy logic and grey theory: A case study of overhead cranes. JHSW. 7 (1), 63-76. . (In Persian)
Pawlak, Z., (2012), Rough sets: Theoretical aspects of reasoning about data, 9, Springer Science & Business Media.
Piri, Halimah. Ansari, Hussein. (2013). Study of Sistan plain drought and its impact on Hamoon International Wetland. Wetland Ecology (Wetland). V5, No. 15, 63-74.(In Persian)
Poor Ahmad, Ahmad. Shahbazpour, Ahmad. Khaliji, Mohammad Ali (2015), Using Multi-Criteria Decision Modeling Models in Assessing the Capacity of Tourist Model Case Study of Semnan Province, Geographical Studies of Dry Areas, Volume 6, Number 21, 50-66. (In Persian)
Qudosipour, Hassan. (2016). Hierarchical Analysis Process (AHP), (Third Edition), Tehran: Amirkabir University of Technology.
Rezaei, Farzin. Ghaybdoost, Hamed. (2016), A Study of the Financial Performance of the Banking Industry by Vikor Method, Journal of Development Management and Special Letter Transformation, pp. 43-33. (In Persian)
Sabzehpour, Majid. (2012), Project Management, Tehran: Termeh .(In Persian)
Seifloo, Sajjad. Askari, Mohammad Mehdi. Sadeghi Shahedani, Mehdi, (2016), Identifying and Prioritizing the Risks of Upstream Oil and Gas Projects in Iran Using Risk Breaking Structure (RBS) and TOPSIS Technique Techniques, Quarterly Journal of Economic Research and Policy, Year 24, No. 78, 96-57. (In Persian)
Shafiee Nikabadi, Mojtaba. Shafiee Nikabadi, Mohsen. Hosseini, Seyed Mohammad Hassan (2016), Development of a model for evaluating and ranking construction projects according to the probability of risk occurrence and its impact on construction performance, Military Management Quarterly, Volume 16, Number 2, Pages 117-157.(In Persian)
Shahraki, Alireza. Jamali Moghadam, Fatemeh. (2016), Development of a Model for Risk Assessment of Construction Projects Based on Theory of Raff Numbers Collection, Journal of Scientific Performance Management, Volume 8, Number 16, Pages 62-39. (In Persian)
Sobhieh, Mohammad Hussein. Ranjbaran, Saeed. (2008), Karzner's organizational maturity model in project management, Project Management Quarterly, No. 3, 11-4. (In Persian)
Sodhis, M., Son, B., & Ting, C., (2014), Perspectives on supply chain Risk Management, Production and operation management, 21, 1-13.
Song, W., Ming, X., and Xu, Z., (2013), Risk evaluation of customer integration in new product development under uncertainty. Computers & Industrial Engineering, 65(3), 402-412.
Tzeng, G. H., and Tasur, S., (1994), The multiple criteria evaluation of grey relation model. The Journal of Grey System, 6(2), 87-108.
Ulfat, Laia, Khosravani, Farzaneh, Jalali, Reza. (1389). Identifying and prioritizing project risk based on PMBOK standard with fuzzy approach (Study: Non-level intersection construction projects in Bushehr province). Industrial Management Studies, 8 (19), 147-163.
Zahraei, benafshe. Roozbehani, Abbas. Mirshakari, Mostafa (2016), Presentation of Risk Analysis Model Based on Fuzzy Expert Systems for Construction Projects Management, Sharif Civil Engineering Quarterly, Volume 32.2, Number 4.1, Pages 61-70. (In Persian)
Zhai, L., Khoo, L., & Zhong, Z., (2008), A rough set enhanced fuzzy approach to quality function deployment. International Journal of Advanced Manufacturing Technology, 37, 613-624.